Estimate wet and wastage-adjusted concrete volume for slabs, footings, columns, walls and circular columns — with optional mix materials and custom ₹/m³ cost.
Last updated: Aug 2026
V_wet = shape formula · V_order = V_wet × (1 + wastage%) · cost = V_order × ₹/m³
Rectangular shapes use length × width × height (or thickness/depth). Circular columns use π × r² × H. Material breakdown uses dry factor 1.54 and cement density 1440 kg/m³.
Calculate wet and wastage-adjusted concrete volume for slabs, footings, columns, walls and circular columns. Optional cement, sand, aggregate and water breakdown from mix assumptions, unit conversion and custom ₹/m³ cost — indicative planning figures only.
Example (slab): 5 m × 4 m × 150 mm. Wet volume = 5 × 4 × 0.15 = 3 m³. With 5% wastage, order volume ≈ 3.15 m³. For M20, dry volume ≈ 3.15 × 1.54; cement share 1/5.5 of dry volume × 1440 kg/m³.
Slab, rectangular footing, rectangular column, wall, circular column, and a custom rectangular volume. Inputs adapt to the selected shape.
Wet volume is the geometric concrete volume from your dimensions. Order volume adds wastage so you can plan ready-mix or site mixing with a buffer.
Optional breakdown uses dry volume ≈ wet × 1.54 and your mix ratio (e.g. M20 = 1:1.5:3). Cement mass uses 1440 kg/m³. Water uses an indicative water–cement ratio by mass. Confirm with your mix design.
Enter a custom rate per cubic metre. Estimated cost = order volume (m³) × your rate. This is indicative only — not a supplier quote.
Yes. Each dimension has its own unit (mm, cm, m, inch, ft). Varnarc converts everything to metres before applying the shape formula.